Members Resources

SUT Events

Aberdeen Branch Webinar - Life Cycle of a North Sea Decommissioning Project Series 1

Aberdeen Branch Webinar – Life Cycle of a North Sea Decommissioning Project Series

Time and date:

6 April, 2021 10:00pm

Book

Webinar – 1330 -1430 BST

Allseas Engineering – Making Single Lift Possible

Presenter: Michael Jeffrey – Lead Heavy Lift Engineer Ninian Northern Platform topsides removal

Click here to watch a short taster video clip from our speaker

Allseas is known for her flagship vessel the Pioneering Spirit and her single lift technology, the Topsides Lift System (TLS).
This talk will present CNRI’s Ninian Northern Platform topsides removal project as a case study concentrating on the work that goes on in the background that makes single lift possible.

The main focus areas will be:

  • The challenges dealing with aging offshore assets
  • Completing preparations amid competing plug & abandonment activities
  • Creative solutions for separating and lifting separating topsides from their jackets
  • Executing a single lift
  • Transferring an asset onshore with a transport barge and heavy lift skidding system

Please click here to read the transcript of the Q&A from this event.

Dates and prices

Order summary

No items have been added to your basket.

Shopping Bag (0)

No items have been added to your basket.

CLOSE