Middle East – Practical Realities of Laying Submarine Flexible Product (Cable, Umbilical & Flexibles) Alongside Choices for Installation Equipment in the Shallow Waters of the Middle East
26 September, 2024
Thursday 26th Sep 2024 | 1830-2130hrs
Venue: Mubarak Marine, Dubai
Registration is FREE but booking is essential.
Presentations followed by light refreshments
Speakers:
Sizing and Fabrication opportunities for high-capacity (10,000Te) turntables and related equipment in the Middle East – Lex Van Doorn, SCA
Installation of umbilicals, cables & flexibles for shallow water application, Reel Drive systems, and alternative methods – Graeme Chalmers, Motive
Case studies on submarine cable loadouts, transport and installation on KSA CRPO 82 and MIP2 projects in the Kingdom of Saudi Arabia – Hans Huijskens or PM, Mermaid